Mounting
The carefully conceived installation procedure in two work steps clearly demonstrates that Siedle call stations were designed to withstand tough practical application on building sites. The basic installation can be performed at a very early stage, but the high-grade housing and the electronic circuitry are only attached right at the end of the constuction phase. This ensures maximum security from theft or damage on the building site. The upper section is mounted without the use of tools, clicks safety into place and remains firmly in position. However, it is still easily removed again, for example to permit servicing work or renovation.
1. Preliminary mounting and pre-installation:
While the building site is in full swing, only the base plate is screwed into place and the wiring carried out.
2. Final mounting:
Only once the rough, dirty work has been completed and site cleared does the electrical installer clip the terminal onto the prepared base plate.
3. Ready:
Thanks to Plug+Play technology, programming takes care of itself.
© 2020 S. Siedle & Söhne OHG
TOP